Background
The objective of this project was to remediate a sedimentation pond,
which is part of a petrochemical plant’s storm and waste water treatment
process. Over the course of 30 years, highly contaminated
sludge reaching up to 330,000 ppm of TPH had accumulated
in the pond.
Solution
Following an evaluation of thermal, physical (centrifugation, solidification)
and biological solutions, Biogenie proposed a guaranteed remedial
solution based on the on-site biological treatment of the waste
followed by disposal of the treated material in a sanitary landfill.
This solution met favourably with the guiding principles of our
client’s Responsible Care Environmental Program while providing substantial cost savings in comparison with the traditional
solution of disposal in a security landfill.
Services
- Preliminary
assessment of the pond;
- Characterization
of the contaminated material;
- Assessment
of the pond, including an estimate of the total volume of contaminated
material utilizing a power-driven sonar;
- Feasibility
study to evaluate various treatment options, including a
treatability
study to validate the viability of a biological treatment solution;
- Securing
of all required permits and design of a site-specific Health &
Safety Program;
- Construction
of an access road as well as two treatment areas;
-
Ex
Situ Biopile treatment
of 7,800 tons of highly contaminated sludge, clayey soils
and sediments;
- Disposal
of the treated material in a sanitary landfill;
- Reconstruction
of the sedimentation basin using a waterproof liner;
- Preparation
of the Remedial Action Completion Report.
This project
is a prime example of Biogenie’s ability to design and implement
customized, cost-efficient and totally guaranteed remedial solutions.