Site Remediation of a Former Petroleum Depot

Background
Leaks and accidental oil spills that occurred in the 50 years the petroleum depot was in service, resulted in soil and groundwater contamination impacted with BTEX, petroleum hydrocarbons, as well as No. 6 fuel (25% of total area). The area of the site was 40,000 m2 and bordered the St. Lawrence River. The property owner, a national railway company, demanded that the petroleum company restore the site in accordance with criteria established for industrial use.

Upon completion of the project, the railway company retained Biogenie’s services to carry on the treatment process in order to attain residential criteria. This was financially beneficial for the railway company since the land could now be sold for riverfront development, increasing property value by an estimated $1.5 M.


Solution

Following a 3D visualization of the site, Biogenie designed a cost-efficient remedial solution which relied on a combination of proprietary in situ and ex situ biological treatment processes. The in situ process was applied to the soil for a total treatment period of 14 months and simultaneously an ex situ Biopile for 20 weeks, resulting in the removal of BTEX by 98% and total petroleum hydrocarbons by 90%.


S
ervices

  • Characterization study of soil and groundwater to determine the extent and degree of contamination;
  • Hydrogeological study and 3-dimensional visualization of the site;
  • Design of the remedial solution;
  • Management and supervision of pipeline decommissioning;
  • Ex situ Biopile treatment of 25,000 tons of soil contaminated with BTEX and petroleum hydrocarbons;
  • Management of 2,450 tons of soil containing No. 6 fuel oil: Ex situ Biopile treatment of 1,125 tons and disposal of 1,325 tons in a landfill;
  • In situ treatment of 27,000 m3 of soil and groundwater containing BTEX and petroleum hydrocarbons;
  • Management and disposal of 5,500 tons of material, debris and oily residue;
  • Implementation of an Environmental Monitoring Program for groundwater situated in fractured rock.
     