Treatment and Disposal of Petroleum Refinery Hazardous Waste

Background
Operation of the petroleum bulk plant over a 45-year period resulted in soil contamination, mainly in the truck loading/unloading area. As the contaminated soil had already been excavated and temporarily stockpiled on site, the objective of this project was to treat 4,000 yd3 of soil impacted with over 3,000 ppm of Diesel Range Organics (DRO) in order to reach a criteria originally established at 1,810 ppm of DRO.
 

Solution
To cost-effectively achieve the project objective, Biogenie proposed a biological treatment solution which bore a performance guarantee. The original criteria was reached after 3 months of treatment. As a new clean up criteria was established at 500 ppm of DRO, Biogenie continued the treatment for an additional 3-month period. Final results indicated that light hydrocarbons were below the detection limit whereas a treatment efficiency of 93% was attained for the DRO.
 

Services

  • Secure required permits from State authorities;
  • Design, construction and operation of an ex situ Biopile treatment system;
  • Ex situ Biopile treatment of 4,000 yd3 of soil impacted with petroleum hydrocarbons;
  • Treatment of process water with a sand and activated carbon treatment system prior to its discharge into a ditch, in conformity with State regulations.

This project is an example of Biogenie’s ability to provide our clients with customized, cost-efficient and totally guaranteed (lump-sum) remedial solutions.